If you prefer to always view the website in English, please click here.

Enel Green Power España starts construction of 35 MW wind farm supported by power purchase agreement between BBVA with Endesa

  • The Primoral wind farm, located in Villamayor de Gállego, in Zaragoza, is expected to enter into service by the end of 2019 and will involve an investment of around 34 million euros
  • BBVA linked its energy supply to the construction of this new wind farm under a bilateral Power Purchase Agreement (PPA), and the facility, which contributes to BBVA's 2025 Commitment, will add to the installed renewable capacity in Spain and help to reduce CO2 emissions 

 

Endesa's renewable energy subsidiary, Enel Green Power España (EGPE), started construction of its 35 MW Primoral wind farm, located in Villamayor de Gállego, Zaragoza, which will involve an investment of around 34 million euros.

The new facility is supported by a long-term Power Purchase Agreement (PPA) signed last year between Endesa and the banking group BBVA. The Primoral wind farm will cover 30% of the energy needs of BBVA's corporate buildings and branch network in Spain, while Endesa will provide the remaining 70% through green certificates.

 

The new wind farm, which will be operated and maintained by EGPE, is expected to come online by the end of 2019 and will consist of 10 wind turbines with a capacity of 3.4 MW each. Once fully operational, Primoral will be able to generate around 108 GWh per year, avoiding the annual emission of approximately 75,000 tonnes of CO2 into the atmosphere.

 

Climate Objectives

The PPA is part of BBVA Group's participation in the RE100 initiative, through which it has committed to cover 100% of its global energy needs with renewable energies. The agreement is also in line with the banking group’s 2025 Commitment, which includes the objective of reducing the Group's CO2 emissions by 68%, equivalent to up to 90,000 tonnes. Another goal is to use 70% of renewable energies by 2025 and 100% by 2030, thus responding to BBVA's adherence to the RE100 initiative, through which leading companies in the fight against climate change commit themselves to reaching this percentage by 2050.

 

The annual energy consumption of the banking group in Spain amounts to 220 GWh in 2018, equivalent to the annual consumption of 67,500 homes or all homes in the province of Soria, all of which is supplied by Endesa, at a fixed price and with a guarantee of origin.

 

The Power Purchase Agreement increases the commitment to environmental sustainability, while boosting cost savings. In the case of BBVA, the bank will pay a fixed price for the electricity supplied by the wind farm, offering annual savings of approximately 10%.

 

In Mexico, BBVA has a PPA in place with Enel Green Power, the global renewable energy business line of Enel, the Group Endesa belongs to, covering 65% of the power consumed by the bank.

Endesa's Projects in Aragon

This new wind farm in Aragon joins the eleven other wind farms that EGPE is building in this autonomous community of Spain, for a total capacity of over 400 MW and an annual generation capacity of around 1,300 GWh, avoiding the annual emission of around 896,000 tonnes of CO2 into the atmosphere.

Specifically, six are located in the province of Teruel: Muniesa, Farlán, San Pedro de Alacón, Allueva, Sierra Pelarda and Sierra Costera I and six in the province of Zaragoza: Campoliva I, El Campo, Santo Domingo de Luna, Loma Gorda, Campoliva II and Primoral. All are expected to come into operation in late 2019.

Out of these wind farms being built in Aragon, 10 are part of the 540 MW[1] awarded to EGPE in May 2017, which also include facilities to be built in Andalusia, Castile-Léon, Castile-La Mancha and Galicia. EGPE has also started building in Extremadura and Murcia the 339 MW of solar capacity awarded at the government's third auction in July 2017.

The construction of the wind (540 MW) and solar (339 MW) capacity awarded in these two auctions involves an investment of over 800 million euros between now and 2020. The additional 879 MW will increase the capacity of EGPE's current renewable energy assets by 52.4%.

EGPE is using a variety of innovative tools and methods to build its wind farms, including drones for topographic surveys, smart tracking of the wind turbine components and advanced digital platforms and software solutions to monitor and provide remote support for site activities and commissioning the wind farms. These tools and solutions will facilitate the rapid gathering of accurate and reliable data on the construction activities, enhancing overall building quality and communications between on- and off-site teams.

In addition, EGPE is employing the "Sustainable Construction Site" model for these projects, which includes the use of solar panels at each site to cover part of their energy needs, and water saving measures such as the installation of water tanks and rainwater collection systems. Upon completion of the construction works, the solar panels and water saving systems will be donated to the towns hosting the projects for public use.

 

Endesa currently manages over 6,553 MW of renewable capacity in Spain, of which 4,710 MW come from large hydropower. The remaining approx. 1,843 MW are operated by Endesa’s renewable company Enel Green Power España and consist of 1,750 MW from wind, 79 MW from mini-hydro and 14 MW from other renewable energy sources.

Enel Green Power is the global renewable energy business line of Enel, the Group Endesa belongs to. The company is dedicated to the development and operation of renewables across the world, with a presence in Europe, the Americas, Asia, Africa and Oceania. Enel Green Power is a global leader in the green energy sector with a managed capacity of over 43 GW across a generation mix that includes wind, solar, geothermal and hydropower, and is pioneering the integration of innovative technologies in renewable power plants.

 

BBVA is a global financial group founded in 1857 with a customer-oriented focus. It is a leader in the Spanish market, is the largest financial institution in Mexico and has leading franchisee locations throughout South America and the Sun Belt in the US. Furthermore, it is the leading shareholder in BBVA Garanti, in Turkey. Its purpose is to make the opportunities provided by this new era available to everybody. This purpose is structured around the real needs of its customers: provide the best solutions and help them to take the best financial decisions, as part of an easy and convenient experience. The Bank is founded on strong values: the customer comes first, we think big and we are all one team. Its responsible banking model aspires to achieve a more inclusive and sustainable company.

 

[1] Campoliva II and Primoral are not included.

Documents

Press release in PDF

PDF (0.29MB) Download
advise icon go to the advise Facebook icon go to Facebook Twitter icon go to Twitter Youtube icon go to Youtube Messenger icon go to Messenger Linkedin icon go to Linkedin Instagram icon go to Instagram Shared Link icon Go to the shared link Checkmark Success icon Checkmark Success down arrow icon down arrow Previous Go to previous Next Go to the next close icon close add icon add up arrow icon up arrow oblique arrow icon look obliquely Arrow down icon Arrow down search engine icon search search engine icon search share icon share filter icon filter email icon send mail email icon email phone icon phone fax icon fac print icon print play icon play user icon go to the user section error icon an error has occurred info icon information thumb up icon like thumb up icon like thumb down icon don't like thumb down icon don't like clock icon Clock Lamp icon Lamp List icon List Map icon Go to the map Phone icon Phone Emergency icon Emergency Pause icon Pause Play icon Play Logout icon Sign off Phone icon Phone Download icon An icon representing a download Chat icon An icon representing a chat
go back icon go back in navigation number 50 icon go to product Tempo Happy 50 Horas calendar icon go to product Tempo Happy Día companies icon go to the business segment gas icon go to gas product catalog rising sun icon go to Tempo Verde-Renewable Energy product home icon go to the household segment 24 hours icon go to One Luz product electricity icon go to Luz's product catalog electricity and gas icon go to the Luz + Gas product catalog moon icon go to product One night light monkey wrench icon go to breakdowns and repairs sun icon go to Tempo Solar product clock icon go to Tempo Happy products 2 hour clock icon go to Tempo Happy 2 Hours product 24 hours icon go to product One Luz number 50 icon go to product Tempo Happy 50 Hours Medium Voltage power line See product catalog with electricity consumption from € 36,000 to € 360,000 / year High Voltage power line See catalog of products with electricity consumption more than € 360,000 / year company icon go to the business segment calendar icon go to product Tempo Happy Day Property management firms icon go to the Property management firms DarkSite icon DarkSite icon light bulb icon See product catalog with electricity consumption less than € 6,000 / year electricity and gas icon go to the Electricity+ Gas Products catalog electricity icon go to the electrical products catalog email icon email contact fax icon fax contact Low Pressure gas icon see catalog of gas products with consumption of less than € 6,000 / year High Pressure gas icon see catalog of gas products with consumption from € 6,000 to € 240,000 / year Medium Pressure gas icon see catalog of gas products with consumption of more than € 240,000 / year gas icon go to gas product catalog Enel icon go to the enel website heater icon heater maintenance service heater maintenance icon go to maintenance service OKGas Heater home icon go to the household segment pressure cooker icon pressure cooker monkey wrench icon go to breakdowns and repairs Medium Voltage power line icon see catalog of electricity products with consumption from € 6,000 to € 36,000 / year moon icon go to product One Night Light sphere icon go to personal website phone icon telephone contact rising sun icon go to Tempo Verde-Renewable Energy product solar panel icon go to photovoltaic solar energy clock icon go to Tempo Happy products black handyman icon with thumb down selected the reaction "I don't like it" little hand icon with thumb down select the reaction "I don't like it" black hand icon with thumb up selected the "like" reaction little hand icon with thumb up select the "like" reaction
Añadir otro equipo eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Eliminar equipo eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Aspiradora Lorem ipsum dolor sit amet, consectetur adipisicing elit. Horno Lorem ipsum dolor sit amet, consectetur adipisicing elit. Lavadora Lorem ipsum dolor sit amet, consectetur adipisicing elit. Lavavajillas Lorem ipsum dolor sit amet, consectetur adipisicing elit. Microondas Lorem ipsum dolor sit amet, consectetur adipisicing elit. Plancha Lorem ipsum dolor sit amet, consectetur adipisicing elit. Punto de recarga vehículo eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Radiador eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Secadora Lorem ipsum dolor sit amet, consectetur adipisicing elit. Split Aire Acondicionado Lorem ipsum dolor sit amet, consectetur adipisicing elit. Termo Lorem ipsum dolor sit amet, consectetur adipisicing elit. Tostador Lorem ipsum dolor sit amet, consectetur adipisicing elit. Vitrocerámica Lorem ipsum dolor sit amet, consectetur adipisicing elit. Power edit Lorem ipsum dolor sit amet, consectetur adipisicing elit. Map marker Lorem ipsum dolor sit amet, consectetur adipisicing elit.