If you prefer to always view the website in English, please click here.
If you are looking for information on the costs that you may expect when registering a new supply, you have come to the right place. Next, we will explain what costs you should take into account depending on whether you are registering electricity or gas.
In addition, you should be aware that these costs associated with contracting the energy supply are laid down through regulations, and are therefore the same regardless of the company you contract.
{{content.phone.text}}
{{content.phone.phoneText}}
{{content.form.text}}
{{content.phone.text}}
{{content.phone.phoneText}}
{{content.form.text}}
The best way to calculate how much it costs to register for a new electricity supply is to take into account the various expenses associated with items related to the new contract, which will be detailed in your first bill.
These items are:
All these charges are paid in your first bill.
There is another cost, Verification fees, which only applies to changes in supplies that have been provided for over 20 years. The cost is 8.01 € fixed, and must be paid when the installation is reviewed
Let's look at a very illustrative and frequent example. The price of registering for a new electricity supply in a new home and they contract 3 kW of power.
| Access to the grid | 19,70 €/kW | 59,11 € |
|---|---|---|
| Extension | 17,30 €/kW | 52,12 € |
| Grid connection | 9,04 € | 9,04 € |
| Security | 13,10 € | 13,10 € |
|
Total |
133,37 € | |
| VAT (21%) | 28,01 € | |
| Illustrative price of registering for a new electricity supply with 3kW of power | 161,38 € |
If the electricity supply is being contracted in a home or premises that has not been without electricity for less than 3 years, it is not considered a new contract but a reactivation. In this case, there is no need pay the cost of extension fees.
There are amounts that are fixed and others that depend on the power in kW you want to contract. In calculating how much it costs to register for a new electricity supply we have set contracting electricity with 3 kW of power as an example.
The Spanish average for new electricity supply contracts is between 3 kW and 4 kW. It is important to have an estimate of the power you want to contract, as that will influence the final price of the electricity being contracted.
In addition, there may also be other contracting expenses associated with the purchase and installation of metering equipment, such as being charged a deposit or fees, etc. In the case of the deposit, the amount paid will be refunded after the last bill has been settled at the time the contract is cancelled.
In the case of new gas supply contracts the installation prices will depend on two factors.
Firstly, the volume of gas you want to contract. In the case of gas this value is measured in kWh (kilo watts per hour).
Secondly, in the case of new supply contracts the cost of the building work required between the gas network and the end customer must also be added. This expense is calculated based on the metres required minus 6 metres (borne by the company).
You don't need to adapt to Endesa's tariffs because they adapt to you. If you go to our catalogue you can compare the different tariffs for yourself. Or if you prefer, you can answer a few questions and we will take care of comparing all the different electricity and gas tariffs and then make a customised recommendation.
Spend a minute to find the product which best adapts to you:
Spend a minute to find the product which best adapts to you:
The costs of register for a new gas supply or the costs of reactivating a supply point that has not been used for more than five years are regulated in Royal Decree 1434/2002 of 14 December. These costs are associated with items related to the new contract that are included in the first bill. These items are:
As mentioned above, the price of new gas supply registration charges depends on the criteria of each autonomous community. In addition, to complicate things further it is also stipulated according to the gas power contracted. There are 4 possible scenarios:
| Andalusia | 59,50 € | 62,83 € | 80,28 € | 88,82 € |
|---|---|---|---|---|
| Aragon | 86,66 € | 91,63 € | 117,04 € | 117,04 € |
| Asturias | 91,71 € | 96,84 € | 123,79 € | 123,79 € |
| Balearic Islands | 80,57 € | 85,18 € | 108,76 € | 108,76 € |
| Cantabria | 71,46 € | 83,68 € | 125,52 € | 125,52 € |
| Castile-La Mancha | 70,21 € | 72,42 € | 104,23 € | 106,82 € |
| Castile-León | 66,89 € | 69,59 € | 98,86 € | 98,86 € |
| Catalonia | 63,51 € | 63,51 € | 101,27 € | 101,27 € |
| Extremadura | 72,99 € | 72,99 € | 102,26 € | 129,59 € |
| Galicia | 75,40 € | 75,40 € | 112,79 € | 112,79 € |
| Madrid | 75,40 € | 75,40 € | 112,79 € | 112,79 € |
| Murcia | 68,98 € | 72,92 € | 93,12 € | 93,12 € |
| Navarre | 77,27 € | 87,65 € | 115,33 € | 115,33 € |
| Basque Country | 86,19 € | 86,19 € | 129,31 € | 129,31 € |
| La Rioja | 71,54 € | 71,54 € | 118,65 € | 118,65 € |
| Valencia (Com.) | 75,18 € | 75,18 € | 124,27 € | 124,27 € |
So many factors influence the price of registering for a new gas supply that it will be better understood with an example:
The situation is registering for a new gas supply in Zaragoza for a house with heating and water. In this case, it would be sufficient to contract approximately 8000 kWh per year. In this case, specifically for the connection there is a need to carry out work spanning 5 metres.
| Service connection of the applicant | 104,20 € x (5 metres - 6 metres) | 0 € |
|---|---|---|
| Supply connection of the contractor | 106,34 € (≤15.000 kWh/year) | 106,34 € |
| Registration charges (Aragón) | 91,63 € (3.2: 5.000- 50.000kWh year) | 91,63 € |
| Security deposit | 2,56 € | 2,56 € |
|
Total |
200,53 € | |
| VAT (21%) | 42,11 € | |
| Illustrative price of registering for a new gas supply with 8000 kWh per year | 242,54 € |
You should know that if you contract both electricity and gas with Endesa together, you will be eligible for additional discounts and benefits.
Before registering, check whether you really need a new supply contract. Sometimes we confuse registering a new supply contract with changing contract holder, and this may entail having to pay certain costs that we shouldn't have to bear.
Remember:
You only need to register for a new supply contract when there is no supply in the house (new occupancy) or the previous supply has been disconnected.
You need to change contract holders if there is still supply, but it is not in your name, that is, for example, when the supply contract belonged to the previous owner. It is better to change contract holders than to disconnect the supply and then reconnect it, as this will avoid many of the costs mentioned above.
If this is your case, before registering for a new supply contract, ask about changing contract holders and view the following content:
How to change the holder of the electricity and/or gas contract?