FAQs

If you prefer to always view the website in English, please click here.

Our action plan to combat Covid-19, at a glance

In this series of videos, our experts explain some of these measures in detail and answer the questions we have received through our social networks.

Infographic: Endesa's public responsibility plan against COVID-19.

Endesa's public responsibility plan in response to Covid-19

With the measures set out in our plan, we are contributing to the fight against the spread of the virus, ensuring the supply of energy, and granting special facilities to our customers.

29 March 2020: We create a €25M fund and activate a plan to provide material, services, equipment and infrastructure.

17 April: We donate materials and services:

·       2M masks and other PPE.

·       Ventilators, tests and drugs.

·       Support for public service teams.

2 April 2020: Special conditions for field hospitals and hospital-hotels: guaranteed free supply.

Financial donations to institutions and organisations to cover basic needs.

  • 10 April 2020: €500,000 to Cruz Roja Responde [Red Cross Responds] to help 25,000 vulnerable families.
  • 15 April 2020: €2.5M to the Madrid and Catalonia regional governments for the most urgent crisis items.
  • 21 April: €200,000 to the CSIC for research into drugs and screening tests.

We collaborate with donations through the Endesa Foundation.

  • 21 March 2020: €415,000 to organisations such as Caritas, Fundación SAFA and Fundación Integra.
  • 9 April 2020: 22,000 protective visors made with 3D printers from the RetoTech programme, in collaboration with BQ.

We guarantee the supply of electricity and incident resolution.

  • 24 March 2020: We strengthen our generation and distribution control centres to ensure supply.
  • 25 March 2020: We duplicate the control centre for renewable facilities.
  • 25 March 2020: We strengthen distribution in neighbourhoods affected by illegal connections.
  • 29 March 2020: We guarantee supply to hospitals:
    • Alternative supply and reserve systems.
    • We provide new supplies and necessary connections.
    • We prioritise incident resolution.

We protect homes and businesses with new measures.

  • 13 March 2020: We halt supply cut-offs to our residential customers for non-payment.
  • 20 March 2020: We respond to urgent breakdowns and activate emergency plans to respond to electricity, gas and equipment repairs.
  • 20 March 2020: We strengthen online customer service and provide facilities with constant updating of the website.
  • 01 April 2020: We extend the Bono Social discount for people left in a vulnerable situation.
  • 01 March 2020: Facilities for companies and the self-employed, giving them the option to:
    • Reduce their power rating.
    • Defer payment of bills (SMEs and self-employed).
    • Suspend supply.

13 March 2020: We put in place measures to protect our employees.

  • Telecommuting for all those positions that allow it or can adapt.
  • And for those who must go into work:
    • We step up the cleaning of facilities.
    • We provide PPE.
    • We maintain constant communication.
    • We keep collaborators informed of the measures.
    • We implement an internal procedure to facilitate communication to those affected.
    • We restrict external visits to headquarters.

 

We continue to work every day on new measures within our Public Responsibility Plan in response to COVID-19.

Related content

advise icon go to the advise Facebook icon go to Facebook Twitter icon go to Twitter Youtube icon go to Youtube Messenger icon go to Messenger Linkedin icon go to Linkedin Instagram icon go to Instagram Shared Link icon Go to the shared link Checkmark Success icon Checkmark Success down arrow icon down arrow Previous Go to previous Next Go to the next close icon close add icon add up arrow icon up arrow oblique arrow icon look obliquely Arrow down icon Arrow down search engine icon search search engine icon search share icon share filter icon filter email icon send mail email icon email phone icon phone fax icon fac print icon print play icon play user icon go to the user section error icon an error has occurred info icon information thumb up icon like thumb up icon like thumb down icon don't like thumb down icon don't like clock icon Clock Lamp icon Lamp List icon List Map icon Go to the map Phone icon Phone Emergency icon Emergency Pause icon Pause Play icon Play Logout icon Sign off Phone icon Phone
go back icon go back in navigation number 50 icon go to product Tempo Happy 50 Horas calendar icon go to product Tempo Happy Día companies icon go to the business segment gas icon go to gas product catalog rising sun icon go to Tempo Verde-Renewable Energy product home icon go to the household segment 24 hours icon go to One Luz product electricity icon go to Luz's product catalog electricity and gas icon go to the Luz + Gas product catalog moon icon go to product One night light monkey wrench icon go to breakdowns and repairs sun icon go to Tempo Solar product clock icon go to Tempo Happy products 2 hour clock icon go to Tempo Happy 2 Hours product 24 hours icon go to product One Luz number 50 icon go to product Tempo Happy 50 Hours Medium Voltage power line See product catalog with electricity consumption from € 36,000 to € 360,000 / year High Voltage power line See catalog of products with electricity consumption more than € 360,000 / year company icon go to the business segment calendar icon go to product Tempo Happy Day Property management firms icon go to the Property management firms DarkSite icon DarkSite icon light bulb icon See product catalog with electricity consumption less than € 6,000 / year electricity and gas icon go to the Electricity+ Gas Products catalog electricity icon go to the electrical products catalog email icon email contact fax icon fax contact Low Pressure gas icon see catalog of gas products with consumption of less than € 6,000 / year High Pressure gas icon see catalog of gas products with consumption from € 6,000 to € 240,000 / year Medium Pressure gas icon see catalog of gas products with consumption of more than € 240,000 / year gas icon go to gas product catalog Enel icon go to the enel website heater icon heater maintenance service heater maintenance icon go to maintenance service OKGas Heater home icon go to the household segment pressure cooker icon pressure cooker monkey wrench icon go to breakdowns and repairs Medium Voltage power line icon see catalog of electricity products with consumption from € 6,000 to € 36,000 / year moon icon go to product One Night Light sphere icon go to personal website phone icon telephone contact rising sun icon go to Tempo Verde-Renewable Energy product solar panel icon go to photovoltaic solar energy clock icon go to Tempo Happy products black handyman icon with thumb down selected the reaction "I don't like it" little hand icon with thumb down select the reaction "I don't like it" black hand icon with thumb up selected the "like" reaction little hand icon with thumb up select the "like" reaction
Añadir otro equipo eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Eliminar equipo eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Aspiradora Lorem ipsum dolor sit amet, consectetur adipisicing elit. Horno Lorem ipsum dolor sit amet, consectetur adipisicing elit. Lavadora Lorem ipsum dolor sit amet, consectetur adipisicing elit. Lavavajillas Lorem ipsum dolor sit amet, consectetur adipisicing elit. Microondas Lorem ipsum dolor sit amet, consectetur adipisicing elit. Plancha Lorem ipsum dolor sit amet, consectetur adipisicing elit. Punto de recarga vehículo eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Radiador eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Secadora Lorem ipsum dolor sit amet, consectetur adipisicing elit. Split Aire Acondicionado Lorem ipsum dolor sit amet, consectetur adipisicing elit. Termo Lorem ipsum dolor sit amet, consectetur adipisicing elit. Tostador Lorem ipsum dolor sit amet, consectetur adipisicing elit. Vitrocerámica Lorem ipsum dolor sit amet, consectetur adipisicing elit. Power edit Lorem ipsum dolor sit amet, consectetur adipisicing elit. Map marker Lorem ipsum dolor sit amet, consectetur adipisicing elit.