If you prefer to always view the website in English, please click here.
New methodology for calculating electricity transmission and distribution tolls.
We want to advise you!
Click here for a Personal Manager to contact you.
Changes in the structure of electricity network access tariffs, which are grouped under new nomenclatures.
Each new tariff will have a new timetable, of 3 or 6 periods of energy, and 2 or 6 periods of power.
In all tariffs there will be several power periods and new calculation models for excess power will appear.
Applicable to supply points intended for public access electric vehicle charging.
The access tariffs determine the cost of the transmission and distribution tolls, as well as the rest of the regulated costs of the electricity bill. From 1 June, we will change from the current 13 tariffs to a segmentation into 6 ordinary tariffs and 2 tariffs for electric vehicles.
| 2.0A, 2.0DHA, 2.0DHS, 2.1A, 2.1DHA y 2.1DHS | 2.0TD |
|---|---|
| 3.0A | 3.0TD |
| 3.1A Voltage < 30kV y 6.1A | 6.1TD |
| 3.1A Voltage ≥ 30kV ≤ 36kV, 6.2 y 6.1B | 6.2TD |
| 6.3 | 6.3TD |
| 6.4, 6.5 | 6.4TD |