If you prefer to always view the website in English, please click here.

Find out about the new regulatory changes and how they impact your Bill

We advise you

Call us at 910 783 723 and we will advise you personally.

We advise you

Call us at 910 783 723 and we will advise you personally.

We advise you

Call us at 910 783 723 and we will advise you personally.

What is going to change?

New methodology for calculating electricity transmission and distribution tolls.

What is going to change?

New methodology for calculating electricity transmission and distribution tolls.

What is going to change?

New methodology for calculating electricity transmission and distribution tolls.

When does it come into force?

From 1 June the CNMC will define the new structure and methodology for the new electricity tolls.

When does it come into force?

From 1 June the CNMC will define the new structure and methodology for the new electricity tolls.

When does it come into force?

From 1 June the CNMC will define the new structure and methodology for the new electricity tolls.

We want to make it easy for you

Find out in detail what's new in the new electricity tolls regulations and how they will be applied in the new tariff structure.


What are these changes?

Name and structure

Changes in the structure of electricity network access tariffs, which are grouped under new nomenclatures.

Name and structure

Changes in the structure of electricity network access tariffs, which are grouped under new nomenclatures.

Name and structure

Changes in the structure of electricity network access tariffs, which are grouped under new nomenclatures.

Change in time slots

Each new tariff will have a new timetable, of 3 or 6 periods of energy, and 2 or 6 periods of power.

Change in time slots

Each new tariff will have a new timetable, of 3 or 6 periods of energy, and 2 or 6 periods of power.

Change in time slots

Each new tariff will have a new timetable, of 3 or 6 periods of energy, and 2 or 6 periods of power.

Power billing

In all tariffs there will be several power periods and new calculation models for excess power will appear.

Power billing

In all tariffs there will be several power periods and new calculation models for excess power will appear.

Power billing

In all tariffs there will be several power periods and new calculation models for excess power will appear.

Tariffs for electric vehicles

Applicable to supply points intended for public access electric vehicle charging.

 

Tariffs for electric vehicles

Applicable to supply points intended for public access electric vehicle charging.

 

Tariffs for electric vehicles

Applicable to supply points intended for public access electric vehicle charging.

 

Discover the new access tariffs

The access tariffs determine the cost of the transmission and distribution tolls, as well as the rest of the regulated costs of the electricity bill. From 1 June, we will change from the current 13 tariffs to a segmentation into 6 ordinary tariffs and 2 tariffs for electric vehicles.

Tariffs before 1 June Tariffs after 1 June
2.0A, 2.0DHA, 2.0DHS, 2.1A, 2.1DHA y 2.1DHS 2.0TD
3.0A 3.0TD
3.1A Voltage < 30kV y 6.1A 6.1TD
3.1A Voltage ≥ 30kV ≤ 36kV, 6.2 y 6.1B 6.2TD
6.3 6.3TD
6.4, 6.5 6.4TD

We explain the new tariffs

Includes supplies that previously corresponded to the old tariffs: 2.0A, 2.0DHA, 2.0DHS, 2.1A, 2.1DHA and 2.1DHS.

Technical summary:

Voltage < 1 kV
Contracted Power
All periods must have ≤ 15 kW
Power Terms  Peak and Valley
Energy Terms
Peak, Flat and Valley
Seasonal Calendar
Single calendar all year
Excess Power
Non-interruptible supplies
Reactive Energy
Not applicable to this tariff

We show you the new timetables: Peninsula, Balearic Islands y Canary Islands

Includes supplies that previously corresponded to the old 3.0A tariff

Technical summary:

Voltage
< 1 kV
Contracted Power
At least one period must have > 15kW
Power Terms
6 increasing terms Pn+1 ≥ Pn
Energy Terms
6 Energy terms
Seasonal Calendar
Single calendar with electricity seasons and 5 geographic zones (Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla)
Excess Power
It will be measured with maximum meters in supplies with contracted power <50 kW and by means of quarter-hourly load curve in the rest of supplies
Reactive Energy
Penalties for excess inductive reactive power

We show you the new timetables:  Peninsula, Balearic Islands y Canary Islands

Includes supplies that previously corresponded to the old tariffs.: 3.1A and 6.1A up to 30 kV

Technical summary:

Voltage
Above 1 kV and below 36 kV
Contracted Power

No limitation applies

Power Terms
6 increasing terms Pn+1 ≥ Pn
Energy Terms
6 Energy terms
Seasonal Calendar
Single calendar with electricity seasons and 5 geographic zones (Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla)
Excess Power
It will be measured with maximum meters in supplies with contracted power <50 kW and by means of quarter-hourly load curve in the rest of supplies.
Reactive Energy
Penalties for excess inductive reactive and capacitive reactive power "(cost 0 €/kVArh for capacitive until 31 December 2021)"

We show you the new timetables:  Peninsula, Balearic Islands y Canary Islands

Includes supplies that previously corresponded to the old tariffs.: 3.1A from 30 kV to 36 kV, 6.1B and 6.2

Technical summary: 

Voltage
Above 30 kV and below 72.5 kV
Contracted Power
No limitation applies
Power Terms
6 increasing terms Pn+1 ≥ Pn
Energy Terms

6 Energy terms
Seasonal Calendar
Single calendar with electricity seasons and 5 geographic zones (Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla)
Excess Power
It will be measured with maximum meters in supplies with contracted power <50 kW and by means of quarter-hourly load curve in the rest of supplies
Reactive Energy
Penalties for excess inductive reactive and capacitive reactive power "(cost 0 €/kVArh for capacitive until 31 December 2021)"

We show you the new timetables: Peninsula, Balearic Islands y Canary Islands

Includes supplies that previously corresponded to the old 6.3 tariff

Technical summary:

Voltage
Above 72 kV and below  145 kV  
Contracted Power

No limitation applies
Power Terms
6 increasing terms Pn+1 ≥ Pn
Energy Terms

6 Energy terms
Seasonal Calendar
Single calendar with electricity seasons and 5 geographic zones (Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla)
Excess Power
It will be measured with maximum meters in supplies with contracted power < 50 kW and by means of quarter-hourly load curve in the rest of supplies
Reactive Energy Penalties for excess inductive reactive and capacitive reactive power."(cost 0 €/kVArh for capacitive until 31 December 2021)"


We show you the new timetables: Peninsula, Balearic Islands y Canary Islands

Includes supplies that previously corresponded to the old tariffs: 6.4 and 6.5

Technical summary:

Voltage
Above 145 kV
 
Contracted Power
No limitation applies
Power Terms
6 increasing terms Pn+1 ≥ Pn
Energy Terms
6 Energy terms
Seasonal Calendar
Single calendar with electricity seasons and 5 geographic zones(Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla)
Excess Power
It will be measured with maximum meters in supplies with contracted power < 50 kW and by means of quarter-hourly load curve in the rest of supplies.
Reactive Energy
Penalties for excess inductive reactive and capacitive reactive power "(cost 0 €/kVArh for
capacitive until 31 December 2021)"

We show you the new timetables: Peninsula, Balearic Islands y Canary Islands

Do you have doubts?

Check out the frequently asked questions from our customers