If you prefer to always view the website in English, please click here.
Find out about the new regulatory changes and how they impact your Bill
What is going to change?
New methodology for calculating electricity transmission and distribution tolls.
What is going to change?
New methodology for calculating electricity transmission and distribution tolls.
What is going to change?
New methodology for calculating electricity transmission and distribution tolls.
When does it come into force?
From 1 June the CNMC will define the new structure and methodology for the new electricity tolls.
When does it come into force?
From 1 June the CNMC will define the new structure and methodology for the new electricity tolls.
When does it come into force?
From 1 June the CNMC will define the new structure and methodology for the new electricity tolls.
We want to make it easy for you
Find out in detail what's new in the new electricity tolls regulations and how they will be applied in the new tariff structure.
What are these changes?
Name and structure
Changes in the structure of electricity network access tariffs, which are grouped under new nomenclatures.
Name and structure
Changes in the structure of electricity network access tariffs, which are grouped under new nomenclatures.
Name and structure
Changes in the structure of electricity network access tariffs, which are grouped under new nomenclatures.
Change in time slots
Each new tariff will have a new timetable, of 3 or 6 periods of energy, and 2 or 6 periods of power.
Change in time slots
Each new tariff will have a new timetable, of 3 or 6 periods of energy, and 2 or 6 periods of power.
Change in time slots
Each new tariff will have a new timetable, of 3 or 6 periods of energy, and 2 or 6 periods of power.
Power billing
In all tariffs there will be several power periods and new calculation models for excess power will appear.
Power billing
In all tariffs there will be several power periods and new calculation models for excess power will appear.
Power billing
In all tariffs there will be several power periods and new calculation models for excess power will appear.
Tariffs for electric vehicles
Applicable to supply points intended for public access electric vehicle charging.
Tariffs for electric vehicles
Applicable to supply points intended for public access electric vehicle charging.
Tariffs for electric vehicles
Applicable to supply points intended for public access electric vehicle charging.
Discover the new access tariffs
The access tariffs determine the cost of the transmission and distribution tolls, as well as the rest of the regulated costs of the electricity bill. From 1 June, we will change from the current 13 tariffs to a segmentation into 6 ordinary tariffs and 2 tariffs for electric vehicles.
Tariffs before 1 June | Tariffs after 1 June |
---|---|
2.0A, 2.0DHA, 2.0DHS, 2.1A, 2.1DHA y 2.1DHS | 2.0TD |
3.0A | 3.0TD |
3.1A Voltage < 30kV y 6.1A | 6.1TD |
3.1A Voltage ≥ 30kV ≤ 36kV, 6.2 y 6.1B | 6.2TD |
6.3 | 6.3TD |
6.4, 6.5 | 6.4TD |
We explain the new tariffs
Includes supplies that previously corresponded to the old tariffs: 2.0A, 2.0DHA, 2.0DHS, 2.1A, 2.1DHA and 2.1DHS.
Technical summary:
Voltage | < 1 kV |
Contracted Power |
All periods must have ≤ 15 kW |
Power Terms |
Peak and Valley |
Energy Terms |
Peak, Flat and Valley |
Seasonal Calendar |
Single calendar all year |
Excess Power |
Non-interruptible supplies |
Reactive Energy |
Not applicable to this tariff |
We show you the new timetables: Peninsula, Balearic Islands y Canary Islands
Includes supplies that previously corresponded to the old 3.0A tariff
Technical summary:
Voltage |
< 1 kV |
Contracted Power |
At least one period must have > 15kW |
Power Terms |
6 increasing terms Pn+1 ≥ Pn |
Energy Terms |
6 Energy terms |
Seasonal Calendar |
Single calendar with electricity seasons and 5 geographic zones (Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla) |
Excess Power |
It will be measured with maximum meters in supplies with contracted power <50 kW and by means of quarter-hourly load curve in the rest of supplies |
Reactive Energy |
Penalties for excess inductive reactive power |
We show you the new timetables: Peninsula, Balearic Islands y Canary Islands
Includes supplies that previously corresponded to the old tariffs.: 3.1A and 6.1A up to 30 kV
Technical summary:
Voltage |
Above 1 kV and below 36 kV |
Contracted Power |
No limitation applies |
Power Terms |
6 increasing terms Pn+1 ≥ Pn |
Energy Terms |
6 Energy terms |
Seasonal Calendar |
Single calendar with electricity seasons and 5 geographic zones (Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla) |
Excess Power |
It will be measured with maximum meters in supplies with contracted power <50 kW and by means of quarter-hourly load curve in the rest of supplies. |
Reactive Energy |
Penalties for excess inductive reactive and capacitive reactive power "(cost 0 €/kVArh for capacitive until 31 December 2021)" |
We show you the new timetables: Peninsula, Balearic Islands y Canary Islands
Includes supplies that previously corresponded to the old tariffs.: 3.1A from 30 kV to 36 kV, 6.1B and 6.2
Technical summary:
Voltage |
Above 30 kV and below 72.5 kV |
Contracted Power |
No limitation applies |
Power Terms |
6 increasing terms Pn+1 ≥ Pn |
Energy Terms |
6 Energy terms |
Seasonal Calendar |
Single calendar with electricity seasons and 5 geographic zones (Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla) |
Excess Power |
It will be measured with maximum meters in supplies with contracted power <50 kW and by means of quarter-hourly load curve in the rest of supplies |
Reactive Energy |
Penalties for excess inductive reactive and capacitive reactive power "(cost 0 €/kVArh for capacitive until 31 December 2021)" |
We show you the new timetables: Peninsula, Balearic Islands y Canary Islands
Includes supplies that previously corresponded to the old 6.3 tariff
Technical summary:
Voltage |
Above 72 kV and below 145 kV |
Contracted Power |
No limitation applies |
Power Terms |
6 increasing terms Pn+1 ≥ Pn |
Energy Terms |
6 Energy terms |
Seasonal Calendar |
Single calendar with electricity seasons and 5 geographic zones (Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla) |
Excess Power |
It will be measured with maximum meters in supplies with contracted power < 50 kW and by means of quarter-hourly load curve in the rest of supplies |
Reactive Energy |
Penalties for excess inductive reactive and capacitive reactive power."(cost 0 €/kVArh for capacitive until 31 December 2021)" |
We show you the new timetables: Peninsula, Balearic Islands y Canary Islands
Includes supplies that previously corresponded to the old tariffs: 6.4 and 6.5
Technical summary:
Voltage |
Above 145 kV |
Contracted Power |
No limitation applies |
Power Terms |
6 increasing terms Pn+1 ≥ Pn |
Energy Terms |
6 Energy terms |
Seasonal Calendar |
Single calendar with electricity seasons and 5 geographic zones(Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla) |
Excess Power |
It will be measured with maximum meters in supplies with contracted power < 50 kW and by means of quarter-hourly load curve in the rest of supplies. |
Reactive Energy |
Penalties for excess inductive reactive and capacitive reactive power "(cost 0 €/kVArh for capacitive until 31 December 2021)" |
We show you the new timetables: Peninsula, Balearic Islands y Canary Islands