Innovation in distribution

New technologies for energy efficiency

Smart grids facilitate better integration of renewable and distributed generation into the electricity system.

Aligned with the Sustainable Development Goals

 

Sustainable development goals

SDG 9: Industry, innovation and infrastructure

SDG 11: Sustainable cities and communities

Innovation is one of the pillars for addressing the challenges of the future of energy. At Endesa we are investing resources and developing research projects and initiatives with the aim of improving the processes related with the distribution network.

There are four action areas with the following projects:

Digitalisation of distribution grids

The digitalisation of activities related with distribution networks is a key factor in making the company’s processes more efficient.

People icon

NDT - Network Digital Twin

Highly computerised digital replication of physical assets and their management, development and maintenance processes. Constantly updated grid data is added to this replica, in real time. Information is transmitted via IoT data networks from the physical assets so it is possible to simulate and study future behaviours and improve the grid's resilience with no impact on the customers.

NDT - Network Digital Twin

Highly computerised digital replication of physical assets and their management, development and maintenance processes. Constantly updated grid data is added to this replica, in real time. Information is transmitted via IoT data networks from the physical assets so it is possible to simulate and study future behaviours and improve the grid's resilience with no impact on the customers.

NDT - Network Digital Twin

Highly computerised digital replication of physical assets and their management, development and maintenance processes. Constantly updated grid data is added to this replica, in real time. Information is transmitted via IoT data networks from the physical assets so it is possible to simulate and study future behaviours and improve the grid's resilience with no impact on the customers.

Smart grid and smart city projects

Their aim is to enable grids to offer an effective response to their users’ needs.

Aerial-Core Project

Development of an integrated aerial cognitive robotic system (a drone) that will have capabilities in the range of operation, handling of grid elements with a robotic arm and safety in interaction with people. 

Aerial-Core Project

Development of an integrated aerial cognitive robotic system (a drone) that will have capabilities in the range of operation, handling of grid elements with a robotic arm and safety in interaction with people. 

Aerial-Core Project

Development of an integrated aerial cognitive robotic system (a drone) that will have capabilities in the range of operation, handling of grid elements with a robotic arm and safety in interaction with people. 

Smart5Grid project

The aim is to establish a safe area in volumetric terms, so that field technicians will be monitored by a real-time tracking system that will use a private 5G network. The project uses alarm signals to warn and make sure that no operators are near energised elements of the substation. 

Smart5Grid project

The aim is to establish a safe area in volumetric terms, so that field technicians will be monitored by a real-time tracking system that will use a private 5G network. The project uses alarm signals to warn and make sure that no operators are near energised elements of the substation. 

Smart5Grid project

The aim is to establish a safe area in volumetric terms, so that field technicians will be monitored by a real-time tracking system that will use a private 5G network. The project uses alarm signals to warn and make sure that no operators are near energised elements of the substation. 

Resisto Project

The aim of the Resisto project is to minimise the impact of weather and other risks by increasing the resilience of the power grid through the use of sensors, prevention algorithms and autonomous drones in the Doñana national park. 

Resisto Project

The aim of the Resisto project is to minimise the impact of weather and other risks by increasing the resilience of the power grid through the use of sensors, prevention algorithms and autonomous drones in the Doñana national park. 

Resisto Project

The aim of the Resisto project is to minimise the impact of weather and other risks by increasing the resilience of the power grid through the use of sensors, prevention algorithms and autonomous drones in the Doñana national park. 

RE2GRID project

Inspection of substations using autonomous drones with BVOLS flight and advanced monitoring and action on high-power transformers in order to contribute to improving the resilience of the power grid and minimise the impact of potential meteorological phenomena. 

RE2GRID project

Inspection of substations using autonomous drones with BVOLS flight and advanced monitoring and action on high-power transformers in order to contribute to improving the resilience of the power grid and minimise the impact of potential meteorological phenomena. 

RE2GRID project

Inspection of substations using autonomous drones with BVOLS flight and advanced monitoring and action on high-power transformers in order to contribute to improving the resilience of the power grid and minimise the impact of potential meteorological phenomena. 

LEO Satellite project

Connectivity through low earth-orbit satellites to enable network automation and remote control in remote areas, thus providing global coverage where mobile phone or fibre optic networks are not available. 

LEO Satellite project

Connectivity through low earth-orbit satellites to enable network automation and remote control in remote areas, thus providing global coverage where mobile phone or fibre optic networks are not available. 

LEO Satellite project

Connectivity through low earth-orbit satellites to enable network automation and remote control in remote areas, thus providing global coverage where mobile phone or fibre optic networks are not available. 

In addition to these innovation projects, in 2022, e-distribución developed a number of technological proofs of concept with start-ups and technology centres aimed at facilitating the incorporation of new technologies and new concepts into the distribution network.

  • "Delimitation of Areas in Transformation Centres": A high-precision monitoring system to help prevent access to risk areas within enclosed spaces, such as transformation centres (medium voltage/low voltage).
  • "Advanced Monitoring of High Voltage Lines" in forest environments, and high and medium voltage networks, the "Living Lab" in Garraf (province of Barcelona) begins to be the scenario for tests of different sensor technologies, for the calculation of the maximum deflection of the line and its structural integrity.
  • “Reset”: Development of a low-voltage four-branch Statcom converter. The aim is to reduce neutral currents and minimise technical losses from the grid.
  • "App Waste Crowdsourcing”: Development of a digital tool (mobile application and backend website platform) for recording and reporting both waste and incidents with birdlife found in the vicinity of aerial networks in rural and forest areas to enable their subsequent management. 

Flexibility projects

Projects like Smartnet and Coordinet aim to investigate and demonstrate the possibilities of network flexibility and its advantages.

Coordinet

Creation of a European energy platform and opening the market to consumers, taking advantage of the flexibility that small generators and demand can offer the system to improve grid stability. The project was completed in 2022. The Spanish pilot scheme was developed in the following locations: Cádiz, Málaga, Murcia, Alicante and Albacete, where different mechanisms were tested to study how the introduction of underutilised resources into the market may generate value for their owners and for the system as a whole. 

Coordinet

Creation of a European energy platform and opening the market to consumers, taking advantage of the flexibility that small generators and demand can offer the system to improve grid stability. The project was completed in 2022. The Spanish pilot scheme was developed in the following locations: Cádiz, Málaga, Murcia, Alicante and Albacete, where different mechanisms were tested to study how the introduction of underutilised resources into the market may generate value for their owners and for the system as a whole. 

Coordinet

Creation of a European energy platform and opening the market to consumers, taking advantage of the flexibility that small generators and demand can offer the system to improve grid stability. The project was completed in 2022. The Spanish pilot scheme was developed in the following locations: Cádiz, Málaga, Murcia, Alicante and Albacete, where different mechanisms were tested to study how the introduction of underutilised resources into the market may generate value for their owners and for the system as a whole. 

Flow

This project was inaugurated on the island of Minorca in 2022 and aims to test new services for the distribution company making use of the mass implementation of electric mobility and to provide flexibility services through a number of electric vehicle charging stations connected to the distribution networks on the island of Minorca.

Flow

This project was inaugurated on the island of Minorca in 2022 and aims to test new services for the distribution company making use of the mass implementation of electric mobility and to provide flexibility services through a number of electric vehicle charging stations connected to the distribution networks on the island of Minorca.

Flow

This project was inaugurated on the island of Minorca in 2022 and aims to test new services for the distribution company making use of the mass implementation of electric mobility and to provide flexibility services through a number of electric vehicle charging stations connected to the distribution networks on the island of Minorca.

BeFlexible

It will promote flexible services that provide benefits to all those involved in the energy market by responding to all manner of consumer needs. For the e-distribución use-case demonstrator, a study will be made of the flexibility services from electric heaters installed in homes in the city of Zaragoza. The project started in 2022, and the different use cases will be studied.

BeFlexible

It will promote flexible services that provide benefits to all those involved in the energy market by responding to all manner of consumer needs. For the e-distribución use-case demonstrator, a study will be made of the flexibility services from electric heaters installed in homes in the city of Zaragoza. The project started in 2022, and the different use cases will be studied.

BeFlexible

It will promote flexible services that provide benefits to all those involved in the energy market by responding to all manner of consumer needs. For the e-distribución use-case demonstrator, a study will be made of the flexibility services from electric heaters installed in homes in the city of Zaragoza. The project started in 2022, and the different use cases will be studied.

Our projects about smart grids

advise icon go to the advise Facebook icon go to Facebook Twitter icon go to Twitter Youtube icon go to Youtube Messenger icon go to Messenger Linkedin icon go to Linkedin Instagram icon go to Instagram Shared Link icon Go to the shared link Checkmark Success icon Checkmark Success down arrow icon down arrow Previous Go to previous Next Go to the next close icon close add icon add up arrow icon up arrow oblique arrow icon look obliquely Arrow down icon Arrow down search engine icon search search engine icon search share icon share filter icon filter email icon send mail email icon email phone icon phone fax icon fac print icon print play icon play user icon go to the user section error icon an error has occurred info icon information thumb up icon like thumb up icon like thumb down icon don't like thumb down icon don't like clock icon Clock Lamp icon Lamp List icon List Map icon Go to the map Phone icon Phone Emergency icon Emergency Pause icon Pause Play icon Play Logout icon Sign off Phone icon Phone
go back icon go back in navigation number 50 icon go to product Tempo Happy 50 Horas calendar icon go to product Tempo Happy Día companies icon go to the business segment gas icon go to gas product catalog rising sun icon go to Tempo Verde-Renewable Energy product home icon go to the household segment 24 hours icon go to One Luz product electricity icon go to Luz's product catalog electricity and gas icon go to the Luz + Gas product catalog moon icon go to product One night light monkey wrench icon go to breakdowns and repairs sun icon go to Tempo Solar product clock icon go to Tempo Happy products 2 hour clock icon go to Tempo Happy 2 Hours product 24 hours icon go to product One Luz number 50 icon go to product Tempo Happy 50 Hours Medium Voltage power line See product catalog with electricity consumption from € 36,000 to € 360,000 / year High Voltage power line See catalog of products with electricity consumption more than € 360,000 / year company icon go to the business segment calendar icon go to product Tempo Happy Day Property management firms icon go to the Property management firms DarkSite icon DarkSite icon light bulb icon See product catalog with electricity consumption less than € 6,000 / year electricity and gas icon go to the Electricity+ Gas Products catalog electricity icon go to the electrical products catalog email icon email contact fax icon fax contact Low Pressure gas icon see catalog of gas products with consumption of less than € 6,000 / year High Pressure gas icon see catalog of gas products with consumption from € 6,000 to € 240,000 / year Medium Pressure gas icon see catalog of gas products with consumption of more than € 240,000 / year gas icon go to gas product catalog Enel icon go to the enel website heater icon heater maintenance service heater maintenance icon go to maintenance service OKGas Heater home icon go to the household segment pressure cooker icon pressure cooker monkey wrench icon go to breakdowns and repairs Medium Voltage power line icon see catalog of electricity products with consumption from € 6,000 to € 36,000 / year moon icon go to product One Night Light sphere icon go to personal website phone icon telephone contact rising sun icon go to Tempo Verde-Renewable Energy product solar panel icon go to photovoltaic solar energy clock icon go to Tempo Happy products black handyman icon with thumb down selected the reaction "I don't like it" little hand icon with thumb down select the reaction "I don't like it" black hand icon with thumb up selected the "like" reaction little hand icon with thumb up select the "like" reaction
Añadir otro equipo eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Eliminar equipo eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Aspiradora Lorem ipsum dolor sit amet, consectetur adipisicing elit. Horno Lorem ipsum dolor sit amet, consectetur adipisicing elit. Lavadora Lorem ipsum dolor sit amet, consectetur adipisicing elit. Lavavajillas Lorem ipsum dolor sit amet, consectetur adipisicing elit. Microondas Lorem ipsum dolor sit amet, consectetur adipisicing elit. Plancha Lorem ipsum dolor sit amet, consectetur adipisicing elit. Punto de recarga vehículo eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Radiador eléctrico Lorem ipsum dolor sit amet, consectetur adipisicing elit. Secadora Lorem ipsum dolor sit amet, consectetur adipisicing elit. Split Aire Acondicionado Lorem ipsum dolor sit amet, consectetur adipisicing elit. Termo Lorem ipsum dolor sit amet, consectetur adipisicing elit. Tostador Lorem ipsum dolor sit amet, consectetur adipisicing elit. Vitrocerámica Lorem ipsum dolor sit amet, consectetur adipisicing elit. Power edit Lorem ipsum dolor sit amet, consectetur adipisicing elit. Map marker Lorem ipsum dolor sit amet, consectetur adipisicing elit.